Quick answer

Under Section 14(3) of RERA, if you notice a structural defect or a defect in workmanship, quality or services within five years of possession, the builder must fix it free within 30 days of your written complaint. If he does not, you can claim compensation from the RERA authority. Taking possession or signing a 'no dues' letter does not end this right. For leakage from a neighbour's flat, the neighbour or society is usually responsible instead.

The five-year defect liability rule in plain words

Section 14(3) of the Real Estate (Regulation and Development) Act, 2016 says: if any structural defect, or any other defect in workmanship, quality or provision of services, or any other obligation of the promoter under the agreement, is brought to the builder's notice within five years from the date of handing over possession, the builder must rectify it without further charge within 30 days. If he fails, the buyer is entitled to compensation.

Three points people miss:

  • The five years run from possession, not from the OC date or the booking date.
  • "Defect" is wide. It covers seepage, cracked plaster, hollow tiles, faulty wiring, weak railings, lifts not working, and fittings below the promised specification.
  • Signing the possession letter does not waive this right. Clauses saying "buyer accepts flat in as-is condition" do not override a statutory duty.

For projects that were not registered under RERA, for example completed before the Act, the same kind of claim can be made in the consumer commission as "deficiency in service", subject to the two-year limitation from when the defect appeared.

Builder defect or neighbour's problem? Find the source first

Before you send any notice, find out where the water or crack is coming from. The answer decides whom you chase.

SourceUsually responsible
Poor waterproofing in a new building, within 5 yearsBuilder (RERA Section 14(3))
Upper flat owner changed tiles or broke the bathroom waterproofingUpper flat owner
Common drain pipe or stack leakingSociety or association; builder if within 5 years and original work
Overhead water tanks on terraceSociety or builder, depending on who controls the terrace
Old building, normal wearOwner of the flat where the leak starts, or society for common parts

A plumber's or civil engineer's written report with photographs is worth getting even if it costs ₹2,000 to ₹5,000. It turns "he says, she says" into evidence. If a society member's renovation upstairs is the cause, the remedies are covered in our guide on neighbour disputes and nuisance, and society-level steps in our housing society disputes guide.

How to record defects so the claim holds up

  • At possession, do a snag list with the builder's representative and get it signed. If they refuse to sign, email it the same day.
  • Date-stamped photos and videos, especially of seepage after rain. Seepage that dries in winter is easy for a builder to deny later.
  • Every complaint in writing: email to the official customer care address and to the director, or letter by speed post. WhatsApp to a site engineer alone is weak proof.
  • Repair estimates from two contractors, and bills for interiors damaged by seepage, like false ceiling, wardrobes or paint.
  • Expert report for structural cracks. A structural engineer can say whether the cracks are cosmetic or a design or concrete issue.

The written complaint matters because the 30-day clock starts from it.

Builder ignoring repair requests: what to do next

Builders often send a mason who paints over seepage, and it returns in the next monsoon. Or they stop answering once all flats are sold.

  1. Legal notice citing Section 14(3), listing defects, and giving 30 days to repair. A lawyer's notice usually costs ₹2,000 to ₹7,000.
  2. RERA complaint under Section 31 if repairs are not done. Ask for (a) a direction to rectify within a fixed time, (b) the cost of repair if you fixed it yourself, and (c) compensation for damage to interiors and inconvenience. Compensation is decided by the adjudicating officer in many states.
  3. Consumer commission as an alternative, especially for older projects. Claim repair cost plus compensation.
  4. Group complaint through the association if defects are in common areas like basement seepage, lifts or fire systems.

If the builder has disappeared after selling the project, recovery gets harder. Our guide on dealing with an absconding builder covers what still works. If the building has no occupancy certificate at all, combine the defects claim with the OC remedy.

Can you repair it yourself and claim the cost?

Yes, but do it carefully. First give the builder written notice and the 30 days. Then, before repair, photograph and video the defect, get the engineer's report and two quotations. Keep the bills. If you repair first and complain later, the builder will say the defect never existed or that your contractor caused it.

Example: Anita takes possession in March. In August the bedroom ceiling and wardrobe are damaged by seepage from the terrace. She emails the builder with photos on 10 August. No action by 10 September. She gets a waterproofing quote of ₹65,000 and a carpenter's estimate of ₹40,000, sends a final notice, then repairs and files a RERA complaint for ₹1.05 lakh plus compensation. Her claim is strong because each step is on paper.

Leakage from the flat above: who pays the repair cost?

If the builder's five years are over, or the cause is the upper owner's own work, the person whose flat the leak starts from generally bears the cost of fixing the source, and the cost of repairing the damage to your flat. Most society bye-laws require members to allow inspection and repair of their premises when it affects others. A tenant downstairs should complain to the landlord, who then takes it up with the upstairs owner or society.

If the upper owner refuses entry, ask the society to issue a written direction. If that fails, a civil court can grant a mandatory injunction directing repair, and award damages. The municipal corporation may also act on a complaint about a dangerous or unsanitary condition.

Mistakes that weaken a defect claim

  • Waiting past the five-year window because the builder kept promising.
  • Doing major renovation, like breaking walls, before documenting the defect.
  • Signing a "full and final satisfaction" letter without recording known defects.
  • Complaining only on the phone.
  • Withholding maintenance to the society in protest. It creates a separate dispute and weakens your position.

How to claim repair of defects from the builder

  1. Find the source. Get a plumber or engineer to confirm whether the defect is original construction or caused by a neighbour.
  2. Document the defect. Take dated photos and videos and collect repair quotations and an expert report.
  3. Complain in writing. Email and post a complaint to the builder citing Section 14(3) of RERA and asking for repair within 30 days.
  4. Send a legal notice. If nothing happens in 30 days, send a lawyer's notice listing defects and costs.
  5. File RERA or consumer complaint. Ask for a direction to repair, the repair cost and compensation for damaged interiors.

Frequently asked questions

What is the defect liability period for a flat under RERA?

Five years from the date the builder hands over possession. Defects reported in this period must be repaired free within 30 days of the complaint, or the buyer can claim compensation.

Does the five-year rule cover seepage and cracks?

Yes. It covers structural defects and defects in workmanship or quality, which includes waterproofing failure, plaster cracks, faulty tiles and plumbing done by the builder.

Can I claim for damaged furniture caused by seepage?

Yes, as compensation, if you prove the damage and link it to the defect. Keep photos, purchase bills and repair estimates for wardrobes, false ceilings or electronics.

The society is not acting on leakage from the upper flat. Where do I complain?

Send a written complaint to the society and upper owner, then approach the registrar of cooperative societies if the society ignores it. A civil suit for injunction and damages is the final option.

Is a resale buyer also covered by the builder's five-year liability?

The period runs from first possession, so a resale buyer gets the balance of the five years. The resale buyer steps into the original allottee's rights, so keep the transfer papers ready.

Can a tenant leave during the lock-in period due to seepage?

If seepage makes the home unfit to live in and the landlord does not repair after notice, a tenant has a strong case to leave without lock-in penalty. Record the complaints and the landlord's replies.

Talk to an advocate about your case

Every case turns on its own documents and dates. If you want someone to look at yours, you can book a consultation with a verified advocate on Hire Your Vakeel, or browse advocates who handle property law matters.

This guide is general legal information, not legal advice. Laws, fees and portal steps change, so confirm the current position with an advocate before you act.

Need legal help for this matter?

Share your case details and preferred consultation mode. Hire Your Vakeel will help you take the next step with an advocate.

Request advocate consultation